project
danube bridge

date
2007

status
design development

size
300m

vis

schwarzplan

längsschn

querschn

iso

danube bridge

location

linz_upper austria

client

study

project

a new bridge is connecting the river sides of the danube in prolongation of the main square in linz.
the traffic streams are lead separately, each flow along it´s ideal path. this concept generates the basic form and leads to the structural system.

dates

length - 300m
construction - prestressed concrete
structuraly relevant sectionarea results from the flow of the momentum

activity

design development

Stockinger Deutsch ZT-GmbH | Büro für Architektur.