









linz_upper austria
study
a new bridge is connecting the river sides of the danube in prolongation of the main square in linz.
the traffic streams are lead separately, each flow along it´s ideal path. this concept generates the basic form and leads to the structural system.
length - 300m
construction - prestressed concrete
structuraly relevant sectionarea results from the flow of the momentum
design development